New Build that is breaking ground and weather permitting will be finished in June or early July 2024. Please for your safety, do not walk around at the site without talking to Agent. This will be a ONE story with many upgrades including an enlarged garage (bigger than what is in the drawing) and some other changes to the floorplan. The living room and master bedroom will have vaulted ceilings. the deck will be 10x22 feet and covered. There will be a tankless gas water heater. The flooring will be upgraded lvp and tile. Kitchen with quartz countertops.
2628211
Residential - Single Family, 1 Story
3
2 Full
2024
Dickson
0.24
Acres
Public
1
Vinyl siding
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...