A202 is the last remaining unit to be built in Revery Point! We have started construction and the estimated completion date is in May 2024. A202 offers 2 bedrooms and 3 full bathrooms with an additional flex room on the main floor. All of the main living is on the first floor with a second floor flex space, full bath, and guest bedroom, as well as attic storage space. Call today to secure this unit and become a resident of Revery Point in Foxland Harbor!
2628733
Residential - Condo, Townhouse, 2 Story, Townhouse
2
3 Full
2023
Sumner
Public
2
Brick,Stone
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...